<?xml version='1.0' encoding='utf-8'?>
<feed xmlns="http://www.w3.org/2005/Atom"><title>Alberta Renewable Energy Records</title><subtitle>New wind + solar generation-share records and new renewable assets on the Alberta (AESO) grid.</subtitle><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/feed.xml" rel="self" /><updated>2026-08-18T03:09:24+00:00</updated><author><name>Alberta Renewable Energy Records</name></author><entry><title>🏆 New 30-day record: wind + solar averaged 34.5% of Alberta net-to-grid generation from May 13, 2026 to June 11, 2026</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#30day-record-20260611</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2026-06-11T00:00:00-06:00</updated><summary>Wind and solar together averaged 34.5% of net-to-grid electricity generation in Alberta over the trailing 30 days from May 13, 2026 to June 11, 2026 — a new 30-day record. The previous record was 33.8% from June 10, 2026. This record was set on a previous day, not today — it is being announced now as this project's automated notifications come online.</summary><content type="html">&lt;p&gt;Wind and solar together averaged &lt;strong&gt;34.5%&lt;/strong&gt; of net-to-grid electricity generation in Alberta over the trailing 30 days from May 13, 2026 to June 11, 2026 — a new 30-day record.&lt;/p&gt;&lt;p&gt;The previous record was 33.8% from June 10, 2026.&lt;/p&gt;&lt;p&gt;This record was set on a previous day, not today — it is being announced now as this project's automated notifications come online.&lt;/p&gt;</content></entry><entry><title>🏆 New monthly record: wind + solar averaged 33.6% of Alberta net-to-grid generation in June 2026</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#monthly-record-202606</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2026-06-01T00:00:00-06:00</updated><summary>Wind and solar together averaged 33.6% of net-to-grid electricity generation in Alberta during June 2026 — a new monthly record. The previous record was 32.2% from April 2024. This record was set on a previous day, not today — it is being announced now as this project's automated notifications come online.</summary><content type="html">&lt;p&gt;Wind and solar together averaged &lt;strong&gt;33.6%&lt;/strong&gt; of net-to-grid electricity generation in Alberta during June 2026 — a new monthly record.&lt;/p&gt;&lt;p&gt;The previous record was 32.2% from April 2024.&lt;/p&gt;&lt;p&gt;This record was set on a previous day, not today — it is being announced now as this project's automated notifications come online.&lt;/p&gt;</content></entry><entry><title>🔋 New energy storage asset on the Alberta grid: Raptor Battery (80 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-RPT2</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2026-04-24T00:00:00-06:00</updated><summary>Raptor Battery (80 MW), an energy storage asset with ID RPT2, has connected to the Alberta grid on April 24, 2026. Confirmed via AESO's market update. There is now a total of 270 MW of storage capacity on the Alberta grid.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Raptor Battery&lt;/strong&gt; (80 MW), an energy storage asset with ID &lt;code&gt;RPT2&lt;/code&gt;, has connected to the Alberta grid on April 24, 2026.&lt;/p&gt;&lt;p&gt;Confirmed via AESO's &lt;a href="https://www.aeso.ca/market/market-updates/2026/new-asset-raptor-battery-rpt1-notice/"&gt;market update&lt;/a&gt;.&lt;/p&gt;&lt;p&gt;There is now a total of 270 MW of storage capacity on the Alberta grid.&lt;/p&gt;</content></entry><entry><title>🏆 New daily-average record: wind + solar averaged 50.8% of Alberta net-to-grid generation on March 7, 2026</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#daily-record-20260307</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2026-03-07T00:00:00-07:00</updated><summary>Wind and solar together averaged 50.8% of net-to-grid electricity generation in Alberta over the full day on March 7, 2026 (total wind+solar MWh divided by total net-to-grid MWh for the day) — a new daily-average record. The previous record was 49.9% from November 2, 2025. This record was set on a previous day, not today — it is being announced now as this project's automated notifications come online.</summary><content type="html">&lt;p&gt;Wind and solar together averaged &lt;strong&gt;50.8%&lt;/strong&gt; of net-to-grid electricity generation in Alberta over the full day on March 7, 2026 (total wind+solar MWh divided by total net-to-grid MWh for the day) — a new daily-average record.&lt;/p&gt;&lt;p&gt;The previous record was 49.9% from November 2, 2025.&lt;/p&gt;&lt;p&gt;This record was set on a previous day, not today — it is being announced now as this project's automated notifications come online.&lt;/p&gt;</content></entry><entry><title>☀️ New solar asset on the Alberta grid: Duchess Solar (20 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-DUS1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2026-02-25T13:00:00-07:00</updated><summary>Duchess Solar (20 MW), a solar asset with ID DUS1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Duchess Solar&lt;/strong&gt; (20 MW), a solar asset with ID &lt;code&gt;DUS1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>☀️ New solar asset on the Alberta grid: Tilley Solar (24 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-TLE1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2025-11-06T10:00:00-07:00</updated><summary>Tilley Solar (24 MW), a solar asset with ID TLE1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Tilley Solar&lt;/strong&gt; (24 MW), a solar asset with ID &lt;code&gt;TLE1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>💨 Wind asset capacity decreased on the Alberta grid: Halkirk 2 (126 → 122 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-capacity-HAL2-122</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2025-09-03T00:00:00-06:00</updated><summary>Halkirk 2, a wind asset with ID HAL2, has its listed maximum capacity decreased from 126 MW to 122 MW in the AESO Current Supply &amp; Demand report. Confirmed via AESO's market update.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Halkirk 2&lt;/strong&gt;, a wind asset with ID &lt;code&gt;HAL2&lt;/code&gt;, has its listed maximum capacity decreased from 126 MW to 122 MW in the AESO Current Supply &amp; Demand report.&lt;/p&gt;&lt;p&gt;Confirmed via AESO's &lt;a href="https://www.aeso.ca/market/market-updates/2025/halkirk-2-hal2-mc-decrease/"&gt;market update&lt;/a&gt;.&lt;/p&gt;</content></entry><entry><title>☀️ New solar asset on the Alberta grid: Gleichen Solar (14 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-GLE1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2025-04-10T12:00:00-06:00</updated><summary>Gleichen Solar (14 MW), a solar asset with ID GLE1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Gleichen Solar&lt;/strong&gt; (14 MW), a solar asset with ID &lt;code&gt;GLE1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>🏆 New annual record: wind + solar averaged 25.7% of Alberta net-to-grid generation in 2025</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#annual-record-2025</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2025-01-01T00:00:00-07:00</updated><summary>Wind and solar together averaged 25.7% of net-to-grid electricity generation in Alberta during 2025 — a new annual record. The previous record was 23.5% from 2024. This record was set on a previous day, not today — it is being announced now as this project's automated notifications come online.</summary><content type="html">&lt;p&gt;Wind and solar together averaged &lt;strong&gt;25.7%&lt;/strong&gt; of net-to-grid electricity generation in Alberta during 2025 — a new annual record.&lt;/p&gt;&lt;p&gt;The previous record was 23.5% from 2024.&lt;/p&gt;&lt;p&gt;This record was set on a previous day, not today — it is being announced now as this project's automated notifications come online.&lt;/p&gt;</content></entry><entry><title>💨 New wind asset on the Alberta grid: Wild Rose (192 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-WIR1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2024-12-18T14:00:00-07:00</updated><summary>Wild Rose (192 MW), a wind asset with ID WIR1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Wild Rose&lt;/strong&gt; (192 MW), a wind asset with ID &lt;code&gt;WIR1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>💨 New wind asset on the Alberta grid: Winnifred Wind (136 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-WIN1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2024-12-03T17:00:00-07:00</updated><summary>Winnifred Wind (136 MW), a wind asset with ID WIN1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Winnifred Wind&lt;/strong&gt; (136 MW), a wind asset with ID &lt;code&gt;WIN1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>☀️ New solar asset on the Alberta grid: Big Sky Solar (140 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-ACD1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2024-11-22T11:00:00-07:00</updated><summary>Big Sky Solar (140 MW), a solar asset with ID ACD1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Big Sky Solar&lt;/strong&gt; (140 MW), a solar asset with ID &lt;code&gt;ACD1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>💨 New wind asset on the Alberta grid: Halkirk 2 (126 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-HAL2</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2024-10-24T17:00:00-06:00</updated><summary>Halkirk 2 (126 MW), a wind asset with ID HAL2, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Halkirk 2&lt;/strong&gt; (126 MW), a wind asset with ID &lt;code&gt;HAL2&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>💨 New wind asset on the Alberta grid: Forty Mile Bow Island (266 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-FRM1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2024-10-23T10:00:00-06:00</updated><summary>Forty Mile Bow Island (266 MW), a wind asset with ID FRM1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Forty Mile Bow Island&lt;/strong&gt; (266 MW), a wind asset with ID &lt;code&gt;FRM1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>☀️ New solar asset on the Alberta grid: Lethbridge Solar (9 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-CLD1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2024-10-15T10:00:00-06:00</updated><summary>Lethbridge Solar (9 MW), a solar asset with ID CLD1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Lethbridge Solar&lt;/strong&gt; (9 MW), a solar asset with ID &lt;code&gt;CLD1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>💨 New wind asset on the Alberta grid: Buffalo Plains (466 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-BPW1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2024-08-28T16:00:00-06:00</updated><summary>Buffalo Plains (466 MW), a wind asset with ID BPW1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Buffalo Plains&lt;/strong&gt; (466 MW), a wind asset with ID &lt;code&gt;BPW1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>🏆 New record: wind + solar reached 58.2% of Alberta net-to-grid generation on April 3, 2024 at 13:00 MDT</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#record-20240403T1300</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2024-04-03T13:00:00-06:00</updated><summary>Wind and solar together supplied 58.2% of net-to-grid electricity generation in Alberta on April 3, 2024 at 13:00 MDT — a new all-time record. It was broken 2 more times earlier that day: 54.6% at 09:00, and 57.4% at 10:00. The previous record was 50.7% from February 23, 2024.</summary><content type="html">&lt;p&gt;Wind and solar together supplied &lt;strong&gt;58.2%&lt;/strong&gt; of net-to-grid electricity generation in Alberta on April 3, 2024 at 13:00 MDT — a new all-time record. It was broken 2 more times earlier that day: 54.6% at 09:00, and 57.4% at 10:00.&lt;/p&gt;&lt;p&gt;The previous record was 50.7% from February 23, 2024.&lt;/p&gt;</content></entry><entry><title>☀️ New solar asset on the Alberta grid: Sollair Solar Energy Plant (75 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-SLR1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-12-30T09:00:00-07:00</updated><summary>Sollair Solar Energy Plant (75 MW), a solar asset with ID SLR1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Sollair Solar Energy Plant&lt;/strong&gt; (75 MW), a solar asset with ID &lt;code&gt;SLR1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>🔋 New energy storage asset on the Alberta grid: eReserve9 (20 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-ERV9</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-12-19T23:00:00-07:00</updated><summary>eReserve9 (20 MW), an energy storage asset with ID ERV9, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;eReserve9&lt;/strong&gt; (20 MW), an energy storage asset with ID &lt;code&gt;ERV9&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>🔋 New energy storage asset on the Alberta grid: eReserve7 (20 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-ERV7</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-12-16T09:00:00-07:00</updated><summary>eReserve7 (20 MW), an energy storage asset with ID ERV7, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;eReserve7&lt;/strong&gt; (20 MW), an energy storage asset with ID &lt;code&gt;ERV7&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>🔋 New energy storage asset on the Alberta grid: eReserve8 (20 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-ERV8</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-12-14T15:00:00-07:00</updated><summary>eReserve8 (20 MW), an energy storage asset with ID ERV8, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;eReserve8&lt;/strong&gt; (20 MW), an energy storage asset with ID &lt;code&gt;ERV8&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>☀️ New solar asset on the Alberta grid: Spring Coulee (30 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-SGC1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-12-13T13:00:00-07:00</updated><summary>Spring Coulee (30 MW), a solar asset with ID SGC1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Spring Coulee&lt;/strong&gt; (30 MW), a solar asset with ID &lt;code&gt;SGC1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>☀️ New solar asset on the Alberta grid: Joffre Solar 1 (25 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-JFS1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-12-12T14:00:00-07:00</updated><summary>Joffre Solar 1 (25 MW), a solar asset with ID JFS1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Joffre Solar 1&lt;/strong&gt; (25 MW), a solar asset with ID &lt;code&gt;JFS1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>🚨 New wind asset on the Alberta grid: Buffalo Atlee 4 (11 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-BFL4</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-12-08T15:00:00-07:00</updated><summary>Buffalo Atlee 4 (11 MW), a wind asset with ID BFL4, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Buffalo Atlee 4&lt;/strong&gt; (11 MW), a wind asset with ID &lt;code&gt;BFL4&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>🚨 New solar asset on the Alberta grid: Joffre Solar 2 (22 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-JFS2</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-12-08T15:00:00-07:00</updated><summary>Joffre Solar 2 (22 MW), a solar asset with ID JFS2, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Joffre Solar 2&lt;/strong&gt; (22 MW), a solar asset with ID &lt;code&gt;JFS2&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>🚨 New wind asset on the Alberta grid: Paintearth Wind Project (198 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-PAW1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-12-08T14:00:00-07:00</updated><summary>Paintearth Wind Project (198 MW), a wind asset with ID PAW1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Paintearth Wind Project&lt;/strong&gt; (198 MW), a wind asset with ID &lt;code&gt;PAW1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>☀️ New solar asset on the Alberta grid: Fox Coulee Solar (80 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-FCS1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-12-07T12:00:00-07:00</updated><summary>Fox Coulee Solar (80 MW), a solar asset with ID FCS1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Fox Coulee Solar&lt;/strong&gt; (80 MW), a solar asset with ID &lt;code&gt;FCS1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>🚨 New wind asset on the Alberta grid: Buffalo Atlee 2 (16 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-BFL2</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-12-05T12:00:00-07:00</updated><summary>Buffalo Atlee 2 (16 MW), a wind asset with ID BFL2, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Buffalo Atlee 2&lt;/strong&gt; (16 MW), a wind asset with ID &lt;code&gt;BFL2&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>🚨 New wind asset on the Alberta grid: Buffalo Atlee 3 (18 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-BFL3</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-12-05T09:00:00-07:00</updated><summary>Buffalo Atlee 3 (18 MW), a wind asset with ID BFL3, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Buffalo Atlee 3&lt;/strong&gt; (18 MW), a wind asset with ID &lt;code&gt;BFL3&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>💨 New wind asset on the Alberta grid: Buffalo Atlee 1 (18 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-BFL1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-12-03T08:00:00-07:00</updated><summary>Buffalo Atlee 1 (18 MW), a wind asset with ID BFL1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Buffalo Atlee 1&lt;/strong&gt; (18 MW), a wind asset with ID &lt;code&gt;BFL1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>☀️ New solar asset on the Alberta grid: Wheatcrest (50 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-WCR1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-11-21T13:00:00-07:00</updated><summary>Wheatcrest (50 MW), a solar asset with ID WCR1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Wheatcrest&lt;/strong&gt; (50 MW), a solar asset with ID &lt;code&gt;WCR1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>☀️ New solar asset on the Alberta grid: Saddlebrook Solar (81 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-SDL1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-11-17T08:00:00-07:00</updated><summary>Saddlebrook Solar (81 MW), a solar asset with ID SDL1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Saddlebrook Solar&lt;/strong&gt; (81 MW), a solar asset with ID &lt;code&gt;SDL1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>💨 New wind asset on the Alberta grid: Jenner 2 (71 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-JNR2</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-11-04T00:00:00-06:00</updated><summary>Jenner 2 (71 MW), a wind asset with ID JNR2, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Jenner 2&lt;/strong&gt; (71 MW), a wind asset with ID &lt;code&gt;JNR2&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>💨 New wind asset on the Alberta grid: Sharp Hill Wind (297 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-SHH1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-11-02T12:00:00-06:00</updated><summary>Sharp Hill Wind (297 MW), a wind asset with ID SHH1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Sharp Hill Wind&lt;/strong&gt; (297 MW), a wind asset with ID &lt;code&gt;SHH1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>🔋 New energy storage asset on the Alberta grid: eReserve6 (20 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-ERV6</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-09-12T17:00:00-06:00</updated><summary>eReserve6 (20 MW), an energy storage asset with ID ERV6, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;eReserve6&lt;/strong&gt; (20 MW), an energy storage asset with ID &lt;code&gt;ERV6&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>🚨 New solar asset on the Alberta grid: Youngstown Solar (6 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-YNG1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-08-25T16:00:00-06:00</updated><summary>Youngstown Solar (6 MW), a solar asset with ID YNG1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Youngstown Solar&lt;/strong&gt; (6 MW), a solar asset with ID &lt;code&gt;YNG1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>🚨 New energy storage asset on the Alberta grid: eReserve4 (20 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-ERV4</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-08-25T14:00:00-06:00</updated><summary>eReserve4 (20 MW), an energy storage asset with ID ERV4, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;eReserve4&lt;/strong&gt; (20 MW), an energy storage asset with ID &lt;code&gt;ERV4&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>☀️ New solar asset on the Alberta grid: Empress Solar Park (39 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-EMP1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-08-11T11:00:00-06:00</updated><summary>Empress Solar Park (39 MW), a solar asset with ID EMP1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Empress Solar Park&lt;/strong&gt; (39 MW), a solar asset with ID &lt;code&gt;EMP1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>☀️ New solar asset on the Alberta grid: Michichi Creek (14 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-MCH1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-08-03T16:00:00-06:00</updated><summary>Michichi Creek (14 MW), a solar asset with ID MCH1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Michichi Creek&lt;/strong&gt; (14 MW), a solar asset with ID &lt;code&gt;MCH1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>💨 New wind asset on the Alberta grid: Stirling Wind (113 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-SWP1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-08-02T21:00:00-06:00</updated><summary>Stirling Wind (113 MW), a wind asset with ID SWP1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Stirling Wind&lt;/strong&gt; (113 MW), a wind asset with ID &lt;code&gt;SWP1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>☀️ New solar asset on the Alberta grid: Deerfoot (41 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-DFT1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-07-20T15:00:00-06:00</updated><summary>Deerfoot (41 MW), a solar asset with ID DFT1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Deerfoot&lt;/strong&gt; (41 MW), a solar asset with ID &lt;code&gt;DFT1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>☀️ New solar asset on the Alberta grid: Stavely (17 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-STV1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-07-19T14:00:00-06:00</updated><summary>Stavely (17 MW), a solar asset with ID STV1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Stavely&lt;/strong&gt; (17 MW), a solar asset with ID &lt;code&gt;STV1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>💨 New wind asset on the Alberta grid: Jenner 1 (122 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-JNR1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-07-14T15:00:00-06:00</updated><summary>Jenner 1 (122 MW), a wind asset with ID JNR1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Jenner 1&lt;/strong&gt; (122 MW), a wind asset with ID &lt;code&gt;JNR1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>☀️ New solar asset on the Alberta grid: Chappice Lake (14 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-CHP1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-04-26T14:00:00-06:00</updated><summary>Chappice Lake (14 MW), a solar asset with ID CHP1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Chappice Lake&lt;/strong&gt; (14 MW), a solar asset with ID &lt;code&gt;CHP1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>☀️ New solar asset on the Alberta grid: Barlow Solar (31 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-BLS1</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-03-29T14:00:00-06:00</updated><summary>Barlow Solar (31 MW), a solar asset with ID BLS1, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;Barlow Solar&lt;/strong&gt; (31 MW), a solar asset with ID &lt;code&gt;BLS1&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry><entry><title>🔋 New energy storage asset on the Alberta grid: eReserve5 Hughenden (20 MW)</title><id>https://jasonrwang.gitlab.io/aeso-metered-volumes/#asset-ERV5</id><link href="https://jasonrwang.gitlab.io/aeso-metered-volumes/" rel="alternate" /><updated>2023-03-22T09:00:00-06:00</updated><summary>eReserve5 Hughenden (20 MW), an energy storage asset with ID ERV5, has begun generating on the Alberta grid. This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's market updates page to verify this asset's actual commissioning status — this pipeline does not read that page.</summary><content type="html">&lt;p&gt;&lt;strong&gt;eReserve5 Hughenden&lt;/strong&gt; (20 MW), an energy storage asset with ID &lt;code&gt;ERV5&lt;/code&gt;, has begun generating on the Alberta grid.&lt;/p&gt;&lt;p&gt;This is based on its first recorded generation, which can include commissioning tests and may precede formal commercial operation. Check AESO's &lt;a href="https://www.aeso.ca/market/market-updates/"&gt;market updates&lt;/a&gt; page to verify this asset's actual commissioning status — this pipeline does not read that page.&lt;/p&gt;</content></entry></feed>